A Hub for Growth + Connectivity

Bristol Myers Squibb

Bristol Myers Squibbs’ (BMS) Lab/Office/Cafeteria (LOC) Building was a key element of the Phase One/Four-building project that established BMS's presence in Central Massachusetts on the Devens Campus. Completed in 2009, the 75,000 SQFT facility serves as the focal point for employee and visitor arrival, check-in, and meetings, and houses the Campus's critical administrative support functions. It plays an essential role in BMS's overall Campus Master Plan for the site.
Presentation Mode
Image
horner_21010_015_open

Connecting Where it Counts

This junction is defined by a two-story circulation space and highlighted by an open ornamental stair and provides the link between the two buildings as a collaborative zone.

Image
horner_21010_057
Image
horner_21010_030

Campus Hub & Assembly Space

This “hub” houses the 300-seat assembly space, providing for cafeteria seating overflow if needed on a day-to-day basis, and Campus-wide “town hall” meetings.

Image
BMS-LOCX JY_-93
Image
BMS-LOCX JY
Image
horner_21010_070

Flexible approaches to furnishing the assembly space can be realized as activities and events change week to week.

Image
horner_21010_086
Image
AC_ARC-LOC_26_w1600
Image
AC_ARC-LOC_16_w1600

The exterior façade proportions and materials of the LOC X were directly derived from the original LOC building – continuing the language of water-struck brick and careful placement of curtainwall and window openings.

Image
AC_ARC-LOC_60_w1600
Image
AC_ARC-LOC_04_w1600

Connecting Where it Counts

The LOC X deftly engages the original LOC at a very limited junction, supporting an efficient flow of personnel arriving from the Garage.

Image
AC_ARC-LOC_82_w160

Photography: Andy Caulfield Photography; John Horner Photography

Project
LOC Expansion Center (LOC X) at Bristol Myers Squibb
Location
Devens, MA
Size
26,500 GSF

A Hub for Growth + Connectivity

Bristol Myers Squibb

Project
LOC Expansion Center (LOC X) at Bristol Myers Squibb
Location
Devens, MA
Size
26,500 GSF
Bristol Myers Squibbs’ (BMS) Lab/Office/Cafeteria (LOC) Building was a key element of the Phase One/Four-building project that established BMS's presence in Central Massachusetts on the Devens Campus. Completed in 2009, the 75,000 SQFT facility serves as the focal point for employee and visitor arrival, check-in, and meetings, and houses the Campus's critical administrative support functions. It plays an essential role in BMS's overall Campus Master Plan for the site.
Presentation Mode
Image
horner_21010_015_open

Connecting Where it Counts

This junction is defined by a two-story circulation space and highlighted by an open ornamental stair and provides the link between the two buildings as a collaborative zone.

Image
horner_21010_057
Image
horner_21010_030

Campus Hub & Assembly Space

This “hub” houses the 300-seat assembly space, providing for cafeteria seating overflow if needed on a day-to-day basis, and Campus-wide “town hall” meetings.

Image
BMS-LOCX JY_-93
Image
BMS-LOCX JY
Image
horner_21010_070

Flexible approaches to furnishing the assembly space can be realized as activities and events change week to week.

Image
horner_21010_086
Image
AC_ARC-LOC_26_w1600
Image
AC_ARC-LOC_16_w1600

The exterior façade proportions and materials of the LOC X were directly derived from the original LOC building – continuing the language of water-struck brick and careful placement of curtainwall and window openings.

Image
AC_ARC-LOC_60_w1600
Image
AC_ARC-LOC_04_w1600

Connecting Where it Counts

The LOC X deftly engages the original LOC at a very limited junction, supporting an efficient flow of personnel arriving from the Garage.

Image
AC_ARC-LOC_82_w160

Photography: Andy Caulfield Photography; John Horner Photography

A Hub for Growth + Connectivity / Bristol Myers Squibb
horner_21010_015_open
AC_ARC-LOC_16_w1600
horner_21010_057
AC_ARC-LOC_60_w1600
horner_21010_030
AC_ARC-LOC_04_w1600
BMS-LOCX JY_-93
AC_ARC-LOC_82_w160
BMS-LOCX JY
horner_21010_070
horner_21010_086
AC_ARC-LOC_26_w1600